After the carlins were installed, I did the beam clamps. These were also quite tricky because of the curve it follows. Before I could start on the side panels and the roof, four roof beams also had to be constructed and installed. These were made out of five 10x25 Meranti stringers bent and glued together in a jig I made for this purpose.
a Didi 34 being built by her owner in his spare time. This blog gives a chronological history of the building process.
Jahazi
Introduction
"If you want to build a ship, don't drum up people to collect wood and don't assign them tasks and work, but rather teach them to long for the endless immensity of the sea"
Antoine de Saint-Exupery
Pages
Showing posts with label 2016. Show all posts
Showing posts with label 2016. Show all posts
Wednesday, 31 August 2016
Cabin construction - Carlin, beam clamps and roof beams
The time has come to start building the cabin. First one must install the carlin. This is a longitudinal beam running along the joint where the cabin sides and the side deck come together. As can be seen on the diagram below, this piece must be cut to fit the angle of the cabin sides as well as the side deck. A 22x70 stringer was first roughly shaped with a skill saw and thereafter planed to get a proper fit. Quite a difficult task if the piece cannot be clamped in a vice because of the awkward shape and because of its shape and the curve it has to follow on deck, fitting it is also not easy.
After the carlins were installed, I did the beam clamps. These were also quite tricky because of the curve it follows. Before I could start on the side panels and the roof, four roof beams also had to be constructed and installed. These were made out of five 10x25 Meranti stringers bent and glued together in a jig I made for this purpose.
After the carlins were installed, I did the beam clamps. These were also quite tricky because of the curve it follows. Before I could start on the side panels and the roof, four roof beams also had to be constructed and installed. These were made out of five 10x25 Meranti stringers bent and glued together in a jig I made for this purpose.
Monday, 14 March 2016
Shear capping strip
The joint between the hull and deck on the shear first needs to be planed flat to the shear plank. A 12 mm plywood capping must then be glued onto this flat surface and finally planed round and fair to the shear curve.
| Planing the shear in preparation for the shear capping |
| Capping placed and glued. |
| Finished |