Next the side decks were installed. The deck stringers were already in position and I only had to plane the surfaces flat to receive the plywood sheets. The sheets were scarfed at the joints in position. All deck sheets were epoxy glued and fastened with stainless steel screws positioned every 200 mm to the stringers and sheer.
Planing the stringers and sheer in preparation for the plywood sheet. |
Measuring and marking to cut to size.
Scarfed joint on the side deck |
No comments:
Post a Comment